e-j-electric
A team from EJ Electric installed the substation. The United States’ largest pre-fabricated traction power substation has been installed in Long Island
EJ Electric carried out the electrical work and the bridge has been welded in place. Electrical work on the new West Thames Pedestrian Bridge in Battery
E-J Electric Installation Co. (EJ-Electric) has been awarded a subcontract for the systems, electrical and transmission line work for the $1.


